- Collection, execution of initial permit documentation; |
- Front-end engineering design (engineering condition surveys, geotechnical evaluation of construction, impact assessment of designed projects on neighboring buildings and constructions; feasibility studies); |
- Engineering surveys (geodesic, geological, hydrometeorological, ecological ones); |
- Design documentation development (all the chapters, including the chapter “Objects of cultural heritage preservation”); |
- Detailed design development; |
- Obtaining of construction permit by a Customer; |
- Objects’ construction design supervision; |
- On-site objects’ construction supervision; |
- Commissioning of equipment; |
- Design documentation translation in a BIM; |
- The state registration of the property right to the constructed objects, including difficult and non-standard cases. |